Dofollow launch sites that were not live the same day: 6 we tried
In October 2026 we tried free options for RadarMakers on 19 launch sites and directories. 6 gave a followed link and were not live the same day. This page lists those 6. It is not every dofollow launch site. Rules may change.
The 10 followed links are on Startup directories with dofollow links: 10 sites we tried. The 4 that were live the same day are on Same day dofollow launch sites: 4 followed links we recorded. Three of the six do not contain queue, scheduled, or waiting line, and do not match a number of days after. Those three are on Followed links with no queue and no day count: 3 we tried. Three of the six say within a day or overnight. Those three are on Launch rows that say within a day or overnight: 3 we tried. The full record of 19 tries is on Where to launch a SaaS: 19 sites we tried.
The 6 followed links that were not live the same day
| Site | Publication or launch timing | Link we got | Worth knowing |
|---|---|---|---|
| GreenRocket | Launched 3 days after we submitted | Followed | The launch page was public before the launch day. |
| HereIsMySaaS | Approved within a day | Followed | Our card showed on the home page, and it sent us 2 visits in the week we measured. |
| Startup Ranked | Live within a day | Followed | Asks for a founder name. |
| Lifto | Live on the second try | Followed | The first try was rejected because our images did not show the product in use. |
| LaunchRanked | Approved overnight; launch week scheduled for December 21 to 27, 2026 | Followed | A coming soon page is public until the launch week. |
| PeerPush | Page public at once, free launch queue of about 97 days | Followed | Sign in with a code sent by e-mail. |
Frequently asked questions
Why are the same day followed links missing?
Four followed links were live the same day: BuildShipper, CLAPSTORM, Peerlist, and BusinessHunt. This page keeps the other six.
Does not live the same day mean the listing never went public?
No. GreenRocket launched 3 days after we submitted. HereIsMySaaS was approved within a day. Startup Ranked was live within a day. Lifto was live on the second try. LaunchRanked names a launch week scheduled for December 21 to 27, 2026. PeerPush names a free launch queue of about 97 days. On both of those rows the link we recorded was followed.
Read the product launch checklist. Submit your product.